Sunday, August 1, 2010

What are sqa process steps?

Steps of SQA process
  1. Initiate SQA Process
  2. Planning
  3. Tracking
  4. Training
  5. Reviews
  6. Issue Resolution
  7. Testing
  8. Audit
  9. Process Improvement



    1-Initiate SQA Process


    QA manager to initiate SQA process for a project, once a P&C is signed off and a formal request is received from Director IT.
    This sub process covers the initiation of SQA process for complete SDLC. An estimation file is made to estimate SQA resources.

    Following Tasks will be performed at this stage
    • Director IT will send a formal request to QA Manager through email for implementation of SQA process.
    • QAM arrange resources, initiate SQA Process and performs SQA activities.
    • Interaction with Customers SQA personnel as per request

    Following personal will be involved
    • Director IT
    • QA Manager
    • QA Team Lead

    2.Planning

    • The sub-process enables planning for SQA activities.
    • SQA group selects the activities for which to develop Plan(s), according to project and departmental needs.
    • Is made at the initial stage of SDLC
    • Define an organization, task and responsibilities within SQA process
    Following Tasks will be performed at this stage
    • Estimation of SQA activities will be done by the SQA Team.
    • The cost and work breakdown will be done by the SQA team.
    • The Timelines (in MS Project Format) will be made.
    • QA Team Lead will give an orientation to the SEG about QALC.
    • Activities are identified which have to be planned.
    • Resources are assigned for planning
    • QA TL prepares SQA + Test Plans.
    • Plans placed in VSS, Notification to PC / PM.
    • Plans are distributed to affected groups.
    Following personal will be involved

    • Project Manager
    • QA Manager
    • QA Team Lead
    • Project Coordinator
    • HR Department

    Test Plan:


    This plan focuses on controlled and managed test activities for any software work product.

    This Plan is developed normally when FS and Design phases are completed.

    Tasks Perform at this stage are:

    • TL prepare Test Plan.
    • Size and Cost estimation is performed.
    • Review report is generated and placed in VSS.
    • QAM will approve the Test Plan.
    • Plans are distributed to affected groups.

    Personals Involved at this stage are:

    • Project Manager
    • QA Manager
    • QA Team Lead
    • Project Coordinator

    APPROACHES:

    • Black and White Box Testing.
    • Acceptance Testing.
    • Integration Testing.         1 Small         2 Large
    • Non-Functional System Testing.
    • Functional System Testing.
    • Component Testing (Unit Testing).
    • Maintenance Testing.
    • System Testing.
    • Shipment Assurance Testing.

    QUALITY OBJECTIVES:

    Developer’s Perspective

    • Correctness / Reliability / Accuracy
    • Integrity
    • Efficiency
    • Maintainability
    • Reusability

    User’s Perspective

    • Usability
    • Understandability
    • Robustness
    • Adaptability
    • Reports can be obtained


    3- Tracking


    This sub-process is used to track deviations and monitor progress against different plans, which can result into updating the timelines, reassignment of tasks.

    Tasks Perform at this stage are:

    • Tracking activities for SQA and Test Plan.
    • Progress Review Meeting is conducted.
    • Progress Review Report is prepared and stored in VSS.
    • If status meeting is postponed then give reason.
    • Deviations are recorded in tracking report.
    • PM will be presented SQA Analysis report on monthly basis.
    • Tracking report is placed in VSS.
    • Report against deviation is also generated.
    • Deviations are identified and issued to affected groups.
    • Issues will be forwarded to Issue Resolution.
    • Status report is dist. and cost effective sheet prepared.

    Personals Involved at this stage are:

    • Project Manager
    • QA Manager
    • QA Team Lead
    • Project Coordinator

    4- Training

    This sub-process includes Project specific and QA specific training.

    • Project specific training can be an orientation / training of a specific design tool for a specific project.
    • QA specific training can be an introduction to expertise that is required to perform activities beyond the existing skill set.

    Tasks Perform at this stage are:

    • Request for Training is placed or training needs are identified.
    • After review SQA Manager forwards the request to training manager.
    • SQAM/TL performs all the required coordination.
    • SQAM/TL implement training plan.
    • Feedback is provided by the affected group after training and updated in training program repository.

    Personals Involved at this stage are:

    • QA Manager
    • QA Team Lead

    5- Reviews

    The sub-process performs Peer reviews and Reviews at the project-level.
    • Peer Reviews will be performed for software related work products i.e. (SQA Plan, Test Plan, Test Cases and Code (Optional)).
    • The objective of peer reviews is to remove defects from the products early and efficiently. The results of the peer review are recorded and passed on to the author or person responsible for correcting defects discovered during the review.
    • Reviews at the project-level are necessary to determine that items are consistent, correct and of acceptable quality.

    Personals Involved at this stage are:

    • QA Manager
    • QA Engineers
    • QA Team Lead
    • Project Manager
    • Project Coordinator

    Tasks Perform at this stage are:

    • All the reviews will be performed as per plan.
    • Team lead will prepare RSSR and then updates it accordingly.
    • Review meeting is confirmed with the Review Team.
    • Review team members prepare review-report-points prior to meeting using the respective Review Check List available in PAD. That check list will be made available along with the software related work product.
    • Software Related Work Product is reviewed during review meeting.
    • After preparation and verification of Review Report team lead will update the respective RSSR.
    • A status is given to the work product being reviewed
    • This status can be: 
      -Accepted (To proceed forward for Approval)
      -Needs Rework (Rework required and then verification should be done)
      -Rejected (New work product is to be prepared). 
      -In case of any issue, “Issue Resolution” sub-process will be followed.

    6- Issue Resolution

    The sub process will help to resolve issues that can come across while performing SQA activities; these issues will be escalated or resolved.

    Is nonconformity or a deviation against standards, resolution of which cannot be agreed upon between SQA team and affected group while performing different SQA activities like Planning, Reviews, Audits and Testing.

    Personals Involved at this stage are:

    • QA Manager
    • QA Engineers
    • QA Team Lead
    • Project Manager
    • Senior Management

    Tasks Perform at this stage are:

    • ‘Issue Escalation and Resolution report’ and ‘Issue Tracking report’ are generated when unresolved issues are confronted.
    • SQA TL notifies affected groups about the meeting using these reports.
    • During meeting if issues resolved then TL updates VSS with these reports.
    • If remain unresolved then escalated to next management level.
    • Even then if issue is not resolved then preventive actions process are initiated.

    7- Testing

    SQA assures that formal software testing is done in accordance with plans and procedures.
    SQA reviews testing documentation for completeness and adherence to standards.
    By test monitoring, SQA assures software completeness and readiness for delivery by executing shipment assurance testing.

    Personals Involved at this stage are:

    • QA Manager
    • QA Engineers
    • Project Manager
    • Project Coordinator

    Tasks Perform at this stage are:

    • Testing approach as defined in test plan.
    • Domain knowledge acquired.
    • TSSR will be made by TL.
    • QAE develop Test case.
    • Test cases executed (Unit, Integration, System).
    • Results are generated as fault reports and escalated to AG.
    • Dev review fault reports and verified after rework.
    • TSSR will be updated with every iteration.
    • Application delivered to client as per release management process.

    8- Audit

    • The sub-process is a fundamental quality assurance technique.
    • Audit will be conducted for all software engineering activities to verify compliance against:
    1. Standards
    2. Processes
    3. Procedures
    • Conformance of development processes to procedures and conformance of product to standards.
    • Also examines conformance of actual status to reported status.

    AUDIT TYPES

    • Organizational based audits (after every three month)
    • Project based audits (after every Two months)
    • Event driven Audits

    Personals Involved at this stage are:

    • Project Manager
    • QA Manager
    • QA Engineers
    • QA Team Lead
    • Project Coordinator

    Tasks Perform at this stage are:

    • Audit should be according to plan.
    • TL makes and afterwards updates ASSR.
    • Audit checklist will be customized and used to conduct audit.
    • Audit will be conducted.
    • Audit report will be published.
    1. PM, Sr. Mgt. -> Project based
    2. -QE, Sr. Mgt. -> Organizational Based
    Affected Groups are informed of NCR by mail
    Hard copy of Non Conformance Report (NCR) is created and duly signed by Software Engineering Group (SEG).
    NCR report is created and unresolved issues are escalated in issue resolution.

    9- Process Improvement

    • Critical function of SQA is Process Improvement.
    • This sub-process includes research and development need of SQA which results into improved processes, checklist and guidelines.

    Personals Involved at this stage are:

    • QA Manager
    • QA Engineers
    • Quality Engineering

    Tasks perform at this stage are:

    • SQA periodically review Software process and improvement activities.
    • QAE / Dev / Mgt generate process improvement request.
    • QAM review process improvement request.
    • QAM accept / reject process improvement Request.
    • Findings are prepared.
    • QAM will approve and review the recommendations and forwarded to QE.
    • Reports will be posted in VSS.

    Monday, June 15, 2009

    What-is-testing-process-performance-model-or-TPPM?

    Testing Process Performance Model


    Testing Process Performance model is to predict the important attributes of testing process and monitor the efficiency and performance of testing process by tracking and analyzing the actual data.

    Monday, April 27, 2009

    What is sanity testing?

    Sanity testing
    Sanity testing is that type of testing in which after first time reporting of bugs and fixing it, before starting regression testing all the software is sane or got through an overview of all the functionality whether there are some ripple effects or not.

    Thursday, April 16, 2009

    What are testing tasks in test plan?

    Testig Tasks
    this part of testing plan identifies the set of tasks necessary to prepare for and perform testing.

    What is suspension criteria and resumption requirements in test plan?

    suspension criteria and resumption requirements
    The purpose of this section of the test plan is to identify any conditions that warrant a temporary suspension of testing and the criteria for resumption.

    Thursday, April 9, 2009

    What are testing types?

    Testing Types

    • Functional Testing
    • Regression Testing
    • Usability Testing
    • Compatibility Testing
    • Performance Testing
    • Security Testing
    • Volume Testing
    • Load Testing
    • Sanity Testing
    • Smoke Testing

    What is system testing?

    System Testing

    System testing is testing conducted on a complete, integrated system to evaluate the system's compliance with its specified requirements.

    It includes following

    • Functional/ Regression Testing
    • Usability Testing
    • Compatibility Testing
    • Performance Testing
    • Security Testing etc

    It is done by testers

    What is exploratory testing?

    Exploratory Testing
    Exploratory testing is a term originally coined in 1998 by Cem Kaner in his book “Testing Computer Software”

    • In exploratory testing the test design and execution are conducted concurrently. The results of a test or group of tests will often prompt the tester to delve deeper into that area (i.e., explore)
    • In structured testing, testers often create many tests that don’t seem as useful during execution as they did during creation

    Tuesday, April 7, 2009

    What is white box testing?

    White Box Testing
    In white box testing, an input must still produce the correct result in order to pass, but now we are also concerned with whether or not the process worked correctly.

    Tuesday, March 24, 2009

    How can achieve high levels of software quality?

    High levels of quality are possible by following methods
    • Enterprise-wide quality programs
    • Quality awareness and training methods
    • Quality standards and guidelines
    • Quality analysis methods
    • Quality measurement methods
    • Defect prevention methods
    • Testing methods
    • User-satisfaction methods
    • Post release quality control

    How software quality can be achieved?

    Achievement of quality would be easy if we are doing the things
    • Apply software engineering methods in effective manner
    • Perform formal technical reviews as per required
    • Software metrics and measurements
    • By testing the software on the right time
    • SCM(Software Configuration Management) and SQA(Software Quality Assurance)
    • and by following standards and procedures.
    After doing the above steps you would be able to get a quality product