Showing posts with label estimation. Show all posts
Showing posts with label estimation. Show all posts

Monday, June 15, 2009

How-estimation-in-TPPM-(-testing-process-performance-model- activity?

In testing PPM first of all estimate following things step by step


  • Size of each Test Case (over all size and lenght of the every  test case is estimated)
  • Defects of each Test Case(defects of the test cases are estimated)
  • Efforts to execute each test case (Efforts are also are part of the estimates)

What-is-Testing-Process-Performance-Model-(TPPM)-activity?

Testing PPM activity

Testing PPM activity can be logically divided into following Sub-Activities.

  • Estimations-here estimations are done
  • Actual Measurement Entry - here we come with actual measures
  • Statistical Analysis - we are doing analysis for the estimations and measure in this activity

What-is-the-sequence-of-testing-process-performance-model-TPPM?

Sequence of TPPM


  • Testing Process Performance model is prepared for each Release testing activity of Project/Product .
  • After test designing of each release, TPPM estimation is completed.
  • While  test execution, TPPM is updated on daily basis or after some defined interval based on release test execution time.